Steve Hegede is a qualified professional, working in Gilead Sciences main office of which is in 1108. on the position of Project Planner and P6 Scheduler since 2017. This person gained professional experience in more than eight positions at different companies. Steve Hegede went to the California State University, Long Beach and was studying from 1992 to 1997. Steve has these qualifications: Primavera Software, Colorado School of Mines Tunnel Management"Short Course", and Project Management In Biotech Certification. Woodmoor, Colorado is the area, where this person was known to be living. Steve Hegede's contacts can be accessed through Connexy by request.
Name variants:
Stephen Hegede
Contact Information
Workplace
Project Planner and P6 Scheduler
San Mateo, CA
Industry
Biotechnology, Mfg Biological Products, Pediatrician, Internist, Pharmaceutical Preparation Manufacturing, Biological Product (except Diagnostic) Manufacturing
Colleagues
Work History
Project Planner and P6 Scheduler
333 Lakeside Dr, Foster City, CA 94404
I am currently a Project Planner/P6 Scheduler at Gilead Sciences helping on Bay Area and international GMP projects (Small Molecule Labs/Pilot Labs/Manufacturing). My approach is to promote ...
from Jan 2017
Primavera P6 Schedule Manager at Cooper Pugeda Management, Inc
65 Mccoppin St, San Francisco, CA 94103
I was the T1C P6 Schedule Manager on the San Francisco International Airport Terminal 1 Renovation Project. The T1 project includes demolishing and rebuilding of Terminal 1 in 2 Stages, and ...
Jan 1, 2016 — Jan 2017
Genentech - P6 Gmp Project Master Scheduler
Consultant CPM Scheduler/Project Controls Specialist at Genentech's Project Services Group. I was assigned to both GMP and non-GMP Projects. My main GMP P6 schedule for a Small Molecule Pote...
May 2013 — Jan 2016
Devil's Slide Tunnel Project, California - P6 Scheduler and Claims
600 Montgomery St, San Francisco, CA 94129
I was the assigned CPM Scheduler for Caltrans on the $430 million Devil's Slide Tunnel Project in Pacifica, California. I reviewed monthly contractor schedule updates/time impact analysis re...
Jul 2007 — May 2013
Los Alamos Laboratory, New Mexico - Primavera Scheduler and Cost and Earned Value Reporting
P/O Box 1663, Los Alamos, NM
I worked on the LANL-Federal Infrastructure Recapitalization Project (FIRP) as a consultant for LANL's Project Management Department. We measured project progress on a variety of diverse sma...
Feb 2005 — Jun 2007
Office Engineer - Federal Bureau of Prisons Project
I was the assigned Office Engineer on the Federal Bureau of Prisons (FBOP) maximum security prison construction project in Tucson, Arizona. My duties included document control using Primaver...
Nov 2002 — Feb 2005
Document Control - Bart and Sfia Extension Project
Oakland, CA
I was the assigned Document Control person for MKC/Washington Group on the BART-San Francisco International Airport Project. I also worked on the BART-SFIA intranet for MKC/Washington Group....
Jun 1998 — Nov 2002
Intranet - San Francisco Public Utilities Commission
I was assigned as the intranet programmer for the SF PUC, and worked with the senior IT person.
May 1998 — Jun 1998
Education
1992 — 1997
Occupations
Planner
Pilot
Scientist
Biotechnology Professional
Executive
Manager
Construction
Air Transportation Worker
Biologist
Biological Scientist
Operations Manager
Skills
Primavera P6
Construction
Project Control
Cpm Scheduling
Contract Management
Project Management
Construction Management
Project Planning
Ms Project
Change Orders
Earned Value Management
Cost Engineering
Microsoft Project
Cost Control
Project Estimation
Microsoft Office
Construction Claims Analysis
Highways
Tunnels
Road
Cost Benefit
Biotechnology
Master Schedule
Monte Carlo Simulation
Project Coordination
Html
Rail
Pertmaster
Gmp Projects
Interactive Planning Session
Linear Schedules
Airports
Tunnel Construction
Airport/Light Rail Construction
Baggage Handling Systems
Tsa Schedule Understanding
Integrated P6 Scheduling
Pull Planning
Prism
Drb Hearing Preparation
Cost Analysis
Natm
Prison Construction
Tunnel Safety Trained
Caltrans Field Safety Trained
Capital Projects
Qualification Phase
Construction Analysis
Iq/Oq/Pq Phase Preparation
Independent Carrier Systems